The Doha Metro is Qatar's most prominent and visible project. It will serve both the capital and the suburbs with all major locations within easy and convenient reach. Most of the Doha Metro lines will be underground, so tunnelling plays a major role in construction. Specialised equipment known as tunnel boring machines (TBMs) are being used to dig the underground sections. This means that there is very little disruption to life on the surface.
The metro system will be built in two phases: the first will see the construction of three out of the four lines (Red, Gold, and Green) and 37 stations. These lines are expected to be open to the public by 2020. The future phases involve the introduction of an additional line (Blue) and the expansion of the existing ones, with more than 60 additional stations and the first expansion will be completed by 2026.
Stations play an important part – both practically and culturally – of any metro system. Architecturally, the stations will reflect the heritage of the country, with a ‘vaulted spaces’ design inspired by traditional Bedouin tents. The largest station, Msheireb, will fall at the heart of the Doha Metro with the Red, Green and Gold lines all meeting at this point.
(Source: https://corp.qr.com.qa)
Follow us on our social media channels:
@ILQlive
@ILQlive
@ILoveQtr
ILoveQatar
If you have anything you want to share with us, send us an e-mail at [email protected]!
Want to send a tip? Drop us an e-mail at [email protected], anonymity is guaranteed!
You have successfully registered your account!
Please confirm your e-mail address by clicking on the URL sent to you.The e-mail usually arrives in 5-10 minutes.How ajeeb was that!? Thanks for contributing to our community! Your post will appear after we take a quick look!